Module 3 · Interactive practice

Value Stream Lab

Change demand, batch size, and inventory in the Jensen Bearings example. Try to shorten lead time while keeping enough capacity to meet demand.

Stream settings

640 units/day
1,000 units
2,250 units
3,350 units
1,475 units
Lead time
16.05 days
Takt time
39.38 s/unit
Line capacity
668.44 units/day
Inventory coverage
Raw material 5 d
After press 3.52 d
After pierce and form 5.23 d
Before shipping 2.3 d
Cycle time including setup
Press 10.2 s
Pierce and form 23.8 s
Finish grind 37.7 s
Required takt time

Finish grind limits capacity. The line is 28.44 units/day above demand.

Why can smaller batches miss demand?

Each changeover takes the same time, so a smaller batch spreads setup time across fewer units. The trial also lowers the buffer quantities. Try increasing just the batch size and see whether capacity recovers while estimated lead time holds steady.

The estimate uses 7 production hours per day and 5 days of raw-material coverage. Time spent processing the product totals 60 seconds before setup. Course reference · Graphical tools for identifying non-value-adding activities, Module 3, pp. 140–142.