Module 2

Operational Excellence

Start with the result the customer needs. Then look at the resources used, the work that adds value, and the evidence that an improvement holds over time.

Jump to practice

Effectiveness, efficiency, and excellence

Operational excellence is an organization-wide approach to improving how work gets done. Leaders make problems visible, employees help solve them, and teams use evidence to improve the processes that serve customers. A change should improve results while protecting quality, reliability, and the ability to keep improving.

Effectiveness
How well a process achieves its intended result, such as meeting the delivery promise.
Efficiency
How well a process uses time, materials, money, or other resources to deliver that result.
Operational excellence (OE)
The organization’s ability to deliver sustainable customer value through reliable performance, employee involvement, and continuous improvement.
Productivity
Output divided by input. State which output and input you are measuring, such as good units per labor-hour.
Worked example

A line meets its target of 1,000 good cartons and cuts the labor needed from 50 hours to 40. What does the evidence show? What would support a claim of operational excellence?

Meeting the target shows effectiveness. Productivity rises from 20 to 25 good cartons per labor-hour, evidence of improved labor efficiency. To assess excellence, check whether the team sustains the results over time while meeting delivery, quality, safety, and waste goals.

From scientific management to Lean Digital

Taylor used time studies and standardization to improve productivity. Ford used the moving assembly line and standardized work to create flow at high volume. The Toyota Production System (TPS) developed demand-driven flow, built-in quality, and employee-led improvement. Lean extends these ideas to different kinds of work. Lean Six Sigma adds statistical methods for variation, and Lean Digital pairs Lean practices with digital tools.

Push production
A forecast or plan triggers production. The upstream process sends work downstream according to that schedule.
Pull production
Customer demand or downstream consumption signals the upstream process to produce or replenish.
Jidoka
Detect an abnormality, stop the process, and correct the problem so defects stay at their source.
Heijunka
Level production volume and mix over time to support steadier flow.
Lean Digital
Apply Lean thinking to the process and choose digital tools that help it create value, such as using inventory signals to support pull replenishment.
Worked example

A warehouse packs its forecast volume every morning. The team switches to replenishing standard containers as stores consume them and records withdrawals with scanners. Which production logic and improvement approach are in use?

Forecast-based packing uses push. Replenishing what the stores consume uses pull. Capturing withdrawals digitally is an example of Lean Digital because it supports the replenishment rule.

Customer value and the eight wastes

Lean starts by defining customer value, mapping the value stream, improving flow, establishing pull, and continuously improving the process. Muda is work that consumes resources and adds no customer value. When examining waste, identify which activities can be removed and which are currently required, such as a mandated inspection.

Defects, overproduction, waiting
Defects cause scrap or rework. Overproduction means making more or earlier than needed. Waiting is idle time for people, material, or equipment.
Unused talent, transportation, inventory
Unused talent leaves people’s knowledge or skills untapped. Transportation is unnecessary movement of items. Inventory is excess stock or work in process.
Motion and excess processing
Motion is unnecessary movement by people, such as taking extra steps or reaching repeatedly. Excess processing is work beyond what the customer or process requires.
Kaizen and standard work
Kaizen engages people in ongoing improvement. Standard work records the best method currently known so a team can perform it consistently and test further changes.
Worked example

A packer walks across the floor for tape, places finished cartons into a holding area because shipping is full, and enters the same tracking number in two systems. Which wastes appear?

Walking for tape is motion. Moving cartons to an extra holding point is transportation, and the accumulated cartons are inventory. Entering the tracking number twice is excess processing.

PDCA, DMAIC, and DPMO

The course presents Deming’s improvement cycle as an inspiration for PDCA. Use PDCA to test and refine a change. Use DMAIC to investigate a recurring problem in an existing process, measure the baseline, and verify that the improvement holds. Lean Six Sigma combines Lean’s focus on flow and waste with Six Sigma’s focus on variation and defects.

PDCA
Plan a change and its measure, Do a test, Check the result against the target, and Act by adopting, adjusting, or retesting the change.
DMAIC
Define the problem and customer requirement, Measure the baseline, Analyze the causes, Improve the process, and Control performance after rollout.
Defects per million opportunities (DPMO)
Divide the number of defects by the total defect opportunities inspected and multiply by 1,000,000. With the same opportunities on every unit, the denominator is units inspected × opportunities per unit.
Sigma level
A lower DPMO corresponds to a higher sigma level. The conversion used in the course includes a 1.5σ shift and places six sigma at about 3.4 DPMO.
Worked example

Inspectors check 400 cartons for three distinct requirements each and count 12 defects. Calculate DPMO. Which DMAIC step would use this as a baseline?

There are 400 × 3 = 1,200 opportunities. DPMO is 12 ÷ 1,200 × 1,000,000 = 10,000. Use the result in Measure, then investigate which requirements fail and why in Analyze.

Process management and performance indicators

Identify and map the process, establish a standard method, measure performance, respond to gaps, and test improvements. Start with the voice of the customer and define a key performance indicator (KPI) with a calculation, data source, owner, review frequency, target, and response when it misses the target.

Delivery and quality KPIs
On-time delivery measures whether orders meet the promised date. A defect rate tracks failure to meet requirements. Define the numerator, denominator, and time period before comparing results.
Maintenance KPIs
Mean time between failures (MTBF) measures typical operating time between failures. Mean time to repair (MTTR) measures typical repair time.
Production KPI
Overall equipment effectiveness (OEE) equals availability × performance × quality. It shows how effectively equipment produces during planned production time.
Worked example

A customer needs at least 98% of orders delivered by the promised date. Of the 200 orders due last week, 188 arrived on time. Define a useful KPI and interpret the result.

Use orders delivered on time ÷ orders due in the week × 100. Use promised and actual delivery dates from the order records. The result is 94%, four percentage points below target. Have the logistics lead review the result weekly and trace the late orders through the process.

Total Quality Management and costs of quality

Total Quality Management (TQM) makes customer-focused quality a responsibility across the organization and supply chain. Kano’s model shows that missing a basic requirement causes dissatisfaction, while an unexpected benefit can delight a customer. The cost of good quality includes prevention and appraisal. The cost of poor quality includes internal and external failures.

Prevention costs
Costs of activities intended to prevent defects, such as training or designing an error-proof fixture.
Appraisal costs
Costs of checking conformance, such as scheduled testing or inspection.
Internal failure costs
Costs of defects found before delivery, such as scrap or rework.
External failure costs
Costs of defects discovered after delivery, such as returns, warranty claims, or complaint handling.
Worked example

A site pays for operator training, routine seal tests, rework of leaking cartons found on the line, and replacement of leaking cartons returned by customers. Classify the four costs.

Training is prevention and routine tests are appraisal. Rework before shipment is internal failure. Replacement after the customer receives the carton is external failure.

EFQM, RADAR, Baldrige, and ISO 9001

The methods answer different management questions. Lean improves customer value and flow in processes. TQM builds responsibility for quality across the organization. EFQM and Baldrige assess performance across the organization. ISO 9001 sets requirements for a quality management system.

EFQM Model
An organization-wide framework for connecting strategy, people, and processes to sustained results and stakeholder value.
RADAR
EFQM’s assessment logic. Specify the Results, choose an Approach, Deploy it, Assess its performance, and Refine it.
Baldrige Excellence Framework
A performance excellence framework that connects leadership, strategy, customers, measurement and knowledge, workforce, operations, and results.
ISO 9001:2015
The edition presented in the course. It specifies requirements for managing quality systematically and meeting customer and applicable requirements.
Worked example

Leaders want to assess whether a new quality approach is implemented across sites and achieves the results they intended. How would RADAR guide that assessment?

State the target results and describe the approach. Check deployment across the sites, assess implementation and results against the targets, and use that evidence to refine the approach.

Interactive practice

Quality and productivity lab

Set defects to 18 while holding units and labor hours steady. Then set labor hours to 40. Which measure changes at each step?

Move a slider or type an exact value.

Defects per million opportunities
7,500
Starting 7,500
Units per labor hour
25
Starting 25

A unit can contain multiple defects. Every unit has the same number of defect opportunities in this example.

Course references